Production & quality · Synthetic business case

Order production planning and material scheduling

How much of this order can the available materials and daily capacity support?

For one sales-order line, connect BOM, stock, purchase arrivals and the capacity calendar. Calculate feasible quantities and schedules before approving the current plan.

Production planningMaterial availabilityCapacity calendar

For · Production and material planners, workshop managers and order-delivery teams

Your path after importing

Follow the process. Check each step.

This is a walkthrough for the product. The page describes the case; calculations and business actions run inside your DataFocus project.

  1. 01

    Select an order line

    Open the production panel from the guide and select line 10 of SO-000001. Inspect BOM, eligible stock, purchase commitments and workshop capacity.

  2. 02

    Analyze quantity and scheduling evidence

    Run analysis first and inspect feasible quantity, batch schedules and shortage evidence. The current algorithm handles one order without BOM scrap allowances; it is not global multi-order optimization.

  3. 03

    Edit the order and recalculate

    Change quantity or the required date in the order source. Confirm the old recommendation cannot be approved and regenerate it using stock less reservations, next-day purchase availability and daily capacity.

  4. 04

    Inspect the approved plan

    Generating a recommendation does not write a formal schedule. Approval requires current permissions, unchanged evidence and full order coverage. Then inspect the formal plan, schedule, shortage alerts and source citations.

Business context

Bring data, knowledge and actions together.

Use these business objects to understand the case. After importing, inspect the fields, relationships and rules, then adapt them to your work.

  • Sales-order lines
  • BOM and material stock
  • Purchase arrivals and capacity calendar
  • Plans, schedules and material-shortage alerts
View package resources32 resources
Business panels
1
Documents
1
Execution definitions
1
Forms
11
Knowledge resources
1
Ontologies
1
Relationships
5
Tables
11

From a demo to your business

Bring a concrete question to the next conversation.

Confirm these differences before choosing the data to connect and the rules to retain. Example data and objects do not automatically connect to your production systems.

  • Map order numbers and lines, BOM components, plants and workshops.
  • Define eligible stock, reservations, purchase availability dates and inspection lead times.
  • Validate one order within the current algorithm before scoping scrap allowances or multi-order optimization.
Explore help and support