# Engineering changes and substitute materials

Synthetic business case

Connect engineering changes, BOMs, substitutes, trial production and quality validation to review production-release evidence.

## Business question

A substitute material is about to enter production. Have validation and production impacts been reviewed?

## Who it is for

Engineering, process design, quality and production management teams

## Business objects

- Engineering change orders
- Material BOMs
- Substitute materials
- Quality validation
- Trial-production status

## Try the workflow

1. Inspect linked business records — Select sample ECO-202606-01 and inspect engineering change orders, material boms, substitute materials and their linked records.
2. Analyze risk and source evidence — Analyze conflicts between unvalidated substitutes and planned production against change policy.
3. Edit source data and recalculate — Edit the engineering-change source record and recalculate to compare production-review proposals.
4. Review and track the current response — Review quality and supply impacts, progress approvals and responses as guided, and inspect change tasks and receipts.

## Adapt to your business

- Link engineering changes, BOM versions, substitutes and affected production scope.
- Confirm validation completion, effectivity and existing-material handling rules.
- Use existing enterprise roles and resource permissions. This package is a synthetic business example; live SAP connections and updates require separate integration and validation.

## Case package

Version: 0.1.0 · 240 rows · 43 resources · 67674 bytes

Package language: Chinese

SHA256: 48ef17293a761db909b311e4ebcf16132c7583ed9431e2fbb0cb8177522801d2

Import checks the required capabilities and your account permissions.

[ZIP](/case-packages/sap-plm-change-demo/0.1.0/case.zip)

[Import guide](/en/cases/import)

Required capabilities: sap-domain-case-workflow v1

This synthetic case is not a customer success story.
